Cable Installation Guide

General Requirements:
Minimum bending radius during installation is 20x cable outer diameter.
Maximum pulling tension must not exceed 50 N/mm2 on the conductor.
Installation temperature must be above 0 degrees Celsius.

Duct Installation:
- Clean and inspect all ducts before pulling
- Apply cable lubricant compatible with the outer sheath material
- Use a cable winch with tension monitoring
- Install at a steady rate of 5-10 m/min

Direct Burial:
- Trench depth minimum 800 mm for urban, 1200 mm for rural
- Sand bedding layer of 100 mm below and above cable
- Warning tape placed 300 mm above cable
- Backfill with compacted excavated material

Jointing:
All joints must be installed in a controlled environment.
Prefabricated joints are preferred for faster installation.
Joint bays require minimum dimensions of 3 m x 1.5 m.